Flashing,Trims & Gutters
TUFGUARD Flashings, trims and gutters can be matched with the panel exterior facer or customized as per the project requirement Flashing & Trims to be lapped at joints as follows, unless specified otherwise.
Vertical and sloping flashings/trims: End laps to be the same as for adjacent sheeting.
Horizontal flashings/trims: End laps to be 150 mm, sealed and where possible arranged with laps away from the prevailing wind.
Flashings/Trims should be fixed to structure wherever there is conjunction with adjacent panels or wall or roof or sheeting.